Mining Strategy

Ferrox plans to extract ore from surface operations utilizing the services
of a mining contractor for the mining operations

  • Ferrox’s operational team has already been in advanced discussions with various local mining contractors. Leisitele (PTY) Limited has been earmarked as the primary Mine Services Contractor. A number of local South African Mine processing companies have been considered.

  • The mining method considered for the Project is conventional open pit mining using truck and excavator combinations.

    • This is a conservative mining method which is well-established with a proven track record in similar operations.

  • The weathered material, approximately 25 m to 40 m deep, will not require blasting and will be removed by an excavator and loaded into haul trucks.

  • The fresh rock will require blasting. Drill rigs will be used to drill blast holes to be charged with explosives and blasted.

  • The blasted material will then be removed by an excavator and loaded into haul trucks.

  • Ore will be transported to the processing facility and waste will be transported to wasted rock dumps.

  • Pit optimization model has been performed and the results are used to develop the production schedule and mine plan.

  • The production scheduling was phased to maintain a lower stripping ratio for as long as possible by extracting ore along the strike of the orebodies before deepening the pits.

Tivani Long term mine layout